New Four-Way Stop to be Built in Electra - KAUZ-TV: Newschannel 6 Now | Wichita Falls, TX

New Four-Way Stop to be Built in Electra

The Texas Department of Transportation plans to install new stop signs on Highway 25 in Electra at the 287 frontage roads starting on Monday, April 6th.  

Drivers have never had to stop at these intersections before, but now both intersections will become four way stops.

The change takes effect as soon as the signs are ready. 
Powered by Frankly